What can go wrong while a block wall is being built

Even a well-planned wall meets surprises once the digging starts. Here is what can happen during the build, and how a careful contractor handles it.

Problems & objectionsLast reviewed: Bauman Raymond Attila

What if the ground is not what we expected?

In short: we stop, show you what we found and agree the change before continuing; fill, clay, rock or old foundations can all change the footing.

The trench is where most surprises appear. Common ones:

  • Loose fill where we expected natural ground.
  • Rock close to the surface.
  • Old foundations or rubble buried along the line.
  • Soft or wet ground near irrigation or drainage.

When this happens, we photograph it, explain what it means for the footing and agree the next step with you before continuing. That is why our quote states its assumptions about the ground. See the foundations guide for how ground affects the footing.

What about pipes and cables in the way?

In short: buried services are common near boundaries; we ask about them first and dig with care, but unknown services can still appear.

Water pipes, irrigation lines, electric cables and drains often run along boundaries. Before digging, we ask you, the community administrator and, where relevant, the utility companies about known services. Plans are not always accurate, so we dig carefully near suspected routes.

If we find an unknown service, we stop and agree how to proceed – diverting it, bridging over it or adjusting the footing. Irrigation lines are the most common find in gardens.

Can weather affect the build?

In short: yes – heavy rain, strong wind and intense heat affect excavation, concrete and render; some stages are rescheduled to protect the work.

Heavy rain floods trenches and makes ground unworkable. Concrete and render do not like extreme heat or strong drying wind while they set; render applied in harsh sun can crack. We schedule sensitive stages – pouring footings, rendering – to suitable conditions and protect fresh work where needed.

This is one reason we do not promise durations in advance: the weather decides some of the timing. We keep you informed and send photos if you are away.

What problems come from access and neighbours?

In short: narrow access, parked cars, shared drives and neighbour concerns can slow the work; agreeing them beforehand avoids most issues.

Materials have to reach the line, and spoil has to leave. On narrow streets, shared drives or terraced gardens, that takes planning. Where we need to work from the neighbour's side – for footings or finishing their face of a party wall – their agreement is essential.

We agree access, storage space for materials and working hours before we start. If you are in a community, tell the administrator about the works.

What happens if you change your mind mid-build?

In short: changes are possible, but some cost more once work has started; we agree any change in writing with its effect on the quote.

Changing the height, the finish or the infill once the footing is poured can mean redoing work. Some changes are easy – the colour of the paint – others are not – making a wall taller than the footing was designed for.

We agree changes in writing, with their effect on the itemised quote. The best protection is to settle the design properly before starting; our post on mistakes when choosing a block wall helps with that. The type pages for split-face and rendered walls list what to decide first.

How do we check quality during the build?

In short: we check line, level and plumb at each stage, inspect footings before pouring and pillars before capping, and share photos so you can see.

Our own checks during the build:

  • Setting out agreed with you before digging.
  • Trench and reinforcement checked before pouring.
  • Courses checked for line, level and plumb as the wall rises.
  • Pillars checked before caps go on.
  • Final walk along the wall before handover.

If you are not in Spain, photos at each stage let you see what is under the finished surface. That record is also useful later.

BR
Bauman Raymond Attila
Author and person responsible · Last reviewed:
Our specialist sites by fence type
FAQ

Frequently asked questions

What is the most common surprise when building a wall?

Ground that differs from what was expected, such as fill or rock, and buried irrigation lines.

Who pays if the ground is worse than expected?

We agree any change before continuing. The quote states its ground assumptions so changes are transparent.

Can work continue in the rain?

Some tasks can, others cannot. We do not pour footings or render in conditions that would harm the work.

Do you check for pipes before digging?

We ask about known services and dig carefully. Unknown services can still appear.

Can I change the design during the work?

Yes, but some changes cost more once work has started. We agree them in writing.

How will I know the footing is right if I am abroad?

We send photos of the trench, reinforcement and pour before they are covered.

What if my neighbour objects during the work?

We stop work on their side until the issue is resolved. Agreeing in advance avoids this.

Do you give a completion date?

We give an indicative schedule and keep you informed. Weather and ground can change timing.

What if a material is out of stock?

We tell you and propose alternatives or a new date. You decide.

Who cleans up after the job?

We do: our waste, spoil as agreed and the work area.